Use and Maintenance of the Vulcanizing Box


Time:

2017-10-25

Equipment maintenance

① Conveyor roller bearings operate at high temperatures and should be promptly lubricated with high-temperature grease.

② Before use, the reducer must be filled with gear oil; after approximately 1,000 hours of operation, the gear oil should be replaced. Appropriate amounts of grease should also be applied between the chain and sprockets.

③ After a period of use, the interior of the vulcanizing chamber must be cleaned; prior to cleaning, the conveyor belt must be removed.

④ After the equipment has been in service for a period of time, the wiring connections of all electrical components inside the power control cabinet should be tightened.