Use and Maintenance of the Vulcanizing Box
Date:
Oct 25,2017
Author:
Hebei Shuangda
Equipment maintenance
① Conveyor roller bearings operate at high temperatures and should be promptly lubricated with high-temperature grease.
② Before use, the reducer must be filled with gear oil; after approximately 1,000 hours of operation, the gear oil should be replaced. Appropriate amounts of grease should also be applied between the chain and sprockets.
③ After a period of use, the interior of the vulcanizing chamber must be cleaned; prior to cleaning, the conveyor belt must be removed.
④ After the equipment has been in service for a period of time, the wiring connections of all electrical components inside the power control cabinet should be tightened.

TAG:
Related Blog
Contact Us
Tel:+86-319-6017632
After-sales: +86-19831968789
Email:shuangdaxiangsu@126.com
Address:Liyuantun Industrial Zone, Weixian County, Xingtai City, Hebei Province, China
Website
Shuangda Rubber Machinery
Tel:+86-319-6017632
After-sales: +86-19831968789
Email:shuangdaxiangsu@126.com
Website:www.shuangdajx.com
Address:Liyuantun Industrial Zone, Weixian County, Xingtai City, Hebei Province, China