undefined
undefined
undefined
+
  • undefined
  • undefined
  • undefined

90 rubber tube replaces independent feeding.


Model XJ-65 XJ-75 XJ-90 XJ-120 Screw Diameter (mm) 65 75 90 120 Length-to-Diameter Ratio 12/14:1 12/14:1 14/16:1 14/16:1 Motor Power (kW) 22 30 45 110 Screw Speed (r/min) 10–70 10–70 10–70 10–70 Production Capacity (kg/h) 60–100 80–160 180–300 300–550 Equipment Installation This equipment can be installed on a pre-cast concrete foundation or placed directly on a flat, level surface. The entire unit is equipped with vibration-damping feet. During installation, ensure proper layout and sufficient operating space. Equipment Operating Instructions Before conducting a trial run, carefully inspect the following items: 1. Verify that the local power supply parameters match those specified in this manual, and confirm that all electrical components are correctly and securely connected. 2. Check all connections for looseness; if any are loose, tighten them promptly. 3. Confirm that the gearbox contains the correct lubricant and that the oil level is adequate. Use medium‑pressure gear oil N150 or another high‑quality gear oil of similar viscosity. The oil level should reach the upper mark on the gearbox’s oil dipstick. 4. Manually rotate the coupling connecting the main motor to the gearbox in a clockwise direction for at least two full revolutions. The rotation should be smooth and effortless. 5. Ensure the main motor rotates in the correct direction: when viewed from the head end, it should turn clockwise. After completing these checks, proceed with the trial run of the main unit. The key steps are as follows: 1. Increase the temperature of the main unit; the specific temperature varies depending on the material being processed and should be set by the user. Once the desired temperature is reached, maintain it for 0.5–1 hour. Monitor the temperature control system during heating to ensure proper operation. 2. Verify that the cooling water system is functioning normally and check for leaks. If any leaks are detected, address them immediately. 3. After completing all the above steps, begin rotating the screw. Do not feed material yet; gradually increase the screw speed to approximately 40 r/min and run the machine idling for about 4–5 minutes. Observe whether the equipment operates smoothly. If any abnormalities occur, stop the machine immediately, rectify the issue, and then restart. Gradually increase both the screw speed and the feed rate until the desired production capacity is achieved.

Key words:

90 rubber tube replaces independent feeding.

Classification:

Product Showcase

电话

Business Hotline:

90 rubber tube replaces independent feeding.


Related products

Feedback