90 rubber tube replaces independent feeding.
Key words:
90 rubber tube replaces independent feeding.
Classification:
Product Showcase
Business Hotline:
90 rubber tube replaces independent feeding.
|
Model number |
XJ-65 |
XJ-75 |
XJ-90 |
XJ-120 |
|
Screw diameter mm |
65 |
75 |
90 |
120 |
|
Length-to-diameter ratio |
12/14: 1 |
12/14: 1 |
14/16: 1 |
14/16: 1 |
|
Motor power (kW) |
22 |
30 |
45 |
110 |
|
Screw rotational speed r/min |
10-70 |
10-70 |
10-70 |
10-70 |
|
Production rate kg/h |
60-100 |
80-160 |
180-300 |
300-550 |
Equipment Installation
This equipment can be installed on a pre-cast concrete foundation or placed directly on a level, stable surface. The entire unit is equipped with vibration‑isolating feet.
During installation, ensure a well-organized layout and leave adequate clearance for operation.
Equipment Operating Instructions
Prior to the equipment’s trial run, the following items shall be inspected one by one.
1. Verify that the on-site power supply parameters match those specified in this manual, and ensure that all electrical components are properly and reliably connected.
2. Inspect all connection points for looseness; if any are found, tighten them promptly.
3. Check that the gearbox contains the correct lubricant and that the oil level is adequate. Use medium‑pressure gear oil N150 or another high‑quality gear oil of similar viscosity; the oil level should reach the upper mark on the gearbox dipstick.
4. Manually rotate the coupling connecting the main motor to the gearbox, ensuring it turns clockwise for at least two full revolutions; the rotation must be smooth and flexible.
5. Verify that the main motor is rotating in the correct direction: when viewed from the head end, it should rotate clockwise.
After completing the inspections of the aforementioned items, a trial run of the host unit may be conducted. The main steps are as follows:
1. Increase the host temperature; the specific temperature varies depending on the material and should be set by the user. Once the host temperature reaches the set value, maintain it for 0.5 to 1 hour. During the heating process, carefully monitor that the temperature control is functioning properly.
2. Verify that the cooling water system is functioning properly. Check for leaks and, if any are present, address them promptly.
3. After completing all the above steps, you may begin rotating the screw. Do not feed material at this stage; gradually increase the screw speed to approximately 40 r/min and run it idling for about 4–5 minutes, observing whether the equipment is operating normally. If any abnormalities are detected, stop the machine immediately to troubleshoot and resolve the issue, then restart it.
Gradually increase the screw speed and feed rate until the desired production rate is achieved.
Related products
Feedback
Shuangda
Hebei Shuangda Rubber Machinery Co., Ltd.
Tel:400-0319-386
Landline:+86-319-6017632
Email:shuangdaxiangsu@126.com
Official website:www.shuangdajx.com
Addr:Liyuantun Industrial Zone, Weixian County, Xingtai City, Hebei Province
Copyright © 2022 Hebei Shuangda Rubber Machinery Co., Ltd.